I have some decent ideas as to why, I’m asking mainly as a hopefully fun contribution here, and to maybe learn some interesting plumbing info!

  • AA5B@lemmy.world
    link
    fedilink
    arrow-up
    1
    ·
    8 months ago

    Labor is the most expensive part: isn’t that just doubling the labor cost? Or is it that when a house is converted, they just thread through the existing leaky plumbing?

    • deleted@lemmy.world
      link
      fedilink
      arrow-up
      2
      ·
      8 months ago

      Labor where I live is not expensive.

      To clarify, it’s done for clean water only.

      They install a 4 inch pvc pipe and thread a 1/2 inch hose inside. So when the hose breaks, the water wouldn’t damage the building. Itll just leak inside the pvc pipe.

      The one ive seen was done while being built.