I built this from scratch, including the the wall framing, drywall, cusom mortar shower pan, and the hardwood floor insert. It was 98% complete here.

    • CleverUserName@lemmy.worldOP
      link
      fedilink
      arrow-up
      2
      ·
      1 year ago

      Thats a hard question to answer. The overall process took a ton of planning and pulled from alot of areas that i have done some work before. If you are familiar with framing, some cement and tile work, i say go for it. Prepare for mistakes amd take your time. The shower pan was more difficult than i thought. It was my first one and i would say it was the hardest part. Getting the angles right to flow water into the drain was tedious. Id say watch some youtube videos on that part for sure and shower waterproofing. This took me about 14 days all together.

      • williamallenbro@beehaw.org
        link
        fedilink
        arrow-up
        1
        ·
        1 year ago

        Thanks for that!

        My biggest concern was the pan as well. The angles seem less like science and more like magic. Maybe I’ll outsource parts of the project ha ha!

        • CleverUserName@lemmy.worldOP
          link
          fedilink
          arrow-up
          1
          ·
          1 year ago

          Anytime. Another option for the shower pan would be a pre-made fiberglass one. They come in a variety of sizes, but the large ones can get expensive. Good luck and share your build!

  • angrylittlekitty@lemmy.one
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    i need to do this with my shower and you’ve just given me total inspiration as to how i’m going to do it! beautiful work 😍

    • CleverUserName@lemmy.worldOP
      link
      fedilink
      arrow-up
      1
      ·
      1 year ago

      Yep. I started with hardwood 1x2’s, cut them to length, sanded them and sealed them with 5 coats of polycrylic sanding between coats. Ive used it before and it penetrates pretty well leaving a very tough finish. Its an experiment though, might not hold up. We will see.

  • Boe6@beehaw.org
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    Beautiful! I’m curious, how much carpentry and plumbing experience do you have? Looks like a pro job from here :)