• regul
    link
    fedilink
    arrow-up
    1
    ·
    3 months ago

    Right. But Caltrain has had multiple full shutdowns over the last couple of years during the catenary installation. If they aren’t able to maintain the tracks with that much shutdown time it’s worrying.