• LettuceTurnipTheBeetOPM
      link
      fedilink
      arrow-up
      1
      ·
      1 year ago

      Medium success, it looks like it sometimes keeps on creating new comments, and I don’t know why.

  • LettuceTurnipTheBeetOPM
    link
    fedilink
    arrow-up
    1
    ·
    edit-2
    1 year ago

    New comment from /u/santacfan on Reddit:

    Okay, I was 3 hours into watching the replay and counting trucks when I noticed Rover 2 chat has picked up the count again. So let’s go with their numbers instead of me going cross eyed trying to watch this for 12 hours.

    Rover 2-

    12:45pm- 144 trucks

    13:15- 150 trucks

    Starbase Live-

    12:23pm- First pump truck lowers

    1:13pm- Second pump truck lowers

  • LettuceTurnipTheBeetOPM
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    New comment from /u/santacfan on Reddit:

    Okay, I was 3 hours into watching the replay and counting trucks when I noticed Rover 2 chat has picked up the count again. So let’s go with their numbers instead of me going cross eyed trying to watch this for 12 hours.

    Rover 2-

    12:45pm- 144 trucks

    13:15- 150 trucks

    13:32- First pump truck leaves site. 151 trucks

    13:43- Second pump truck leaves site. 152 trucks

    14:25- 160 trucks

    15:00- It’s the pour that never ends It goes on and on my friends Some trucks started pouring, not knowing how deep it was And they’ll continue pouring because 33 raptors tried to dig to china

    15:01- 168 trucks

    15:23- 3rd pump truck leaves. The concrete trucks though, they keep coming. 170

    15:35- 4th back up pump truck leaves. Truck 171 pulls in

    15:45- 174 trucks in. 5 trucks have left with their tag wheels down though indicating they are still full. So they might be done.

    16:00- I’m calling it. The last truck was stopped and diverted down to the electrical trench.

    174 trucks in. 6 trucks left loaded. So 168 trucks overall. Add in the 132 from the last big pour and we’re at even 300 truck loads.

    Starbase Live-

    12:23pm- First pump truck lowers

    1:13pm- Second pump truck lowers

    3:12pm- Third pump truck lowers

    8:38pm- Work never ends. There are people gathered around the area where the doghouse used to be covering the cryo pipes and at least a couple of people on top of the OLM.

    (This gets synced)