More progress on the Rotor/Motor factory, today. I’d say maybe halfway done with the cosmetics?

Basement floor (logistics for Motors, Depot, & Sink) is fully done, I think.

Also the first floor itself. Except for walls.

Also the top-most floor (Iron Ingot).

Also the logistics floor below that. And this sorta-balcony thing.

Some wide shots.