More progress on the Rotor/Motor factory, today. I’d say maybe halfway done with the cosmetics?
Basement floor (logistics for Motors, Depot, & Sink) is fully done, I think.
Also the first floor itself. Except for walls.
Also the top-most floor (Iron Ingot).
Also the logistics floor below that. And this sorta-balcony thing.
Some wide shots.
Gettin’ there ;)