Many U.S. cities are grappling with broken-down electric transit vehicles that cannot be fixed, months after the largest E-bus manufacturer filed for bankruptcy.
I’m sure most of the bus was parts off the shelf. The electronics to power the motors, which probably failed due to vibrations are not off the shelf equipment.
I’m sure most of the bus was parts off the shelf. The electronics to power the motors, which probably failed due to vibrations are not off the shelf equipment.